Anti-terrorism and anti-hazard rectification project tender announcement

Project Name Anti-terrorist Material Prevention and Remediation Project

Item Number-TLMYT-0010283
I. Tender conditions
The construction project of this project has fulfilled relevant approval and filing procedures as required. The funds have been implemented and the conditions for tendering have been met.
II. Overview and scope of tender
Security and anti-terrorism prevention and anti-hazard rectification project
Security and anti-terrorist prevention and anti-hazard rectification project is divided into two bid sections, and the project content is as follows: (1), a tender section: physical defense section 1, the property management department security facilities and the corporate culture center gymnasium monitoring room doors and windows transformation. 2. New emergency shelters were built at the base station of the Kashgar Oil and Gas Operation Center, and a car stop was installed outside the gates. 3. On the east side and the south side of the Refining & Chemical Sales Department, a girdle wire roller cage is set on the brick wall, and a monitoring system is set up in the hospital. 4. The Kashi Tarim Petroleum Hotel has demolished the backyard and Kashi greenery to corrode and collapse the wall, newly build a brick wall, and set up a monitoring system in the hospital. 5. A new barbed wire enclosure outside the outer wall of the fertilizer plant's ammonia tank area and a safety warning sign. 6. Raise the height of the surrounding brick walls and wrought iron fences of the existing exit control center and install a barbed wire blade roll cage. Newly-built guard room and supporting facilities on the north side. 7. New card point rooms (including one duty room, lounge and bathroom) and supporting facilities in Hotan River Operation Area. 8. The Dabei operation area natural gas processing plant added iron stab walls and iron gates 50 meters outside the original iron fence. 9. The original iron grating wall in the office and living area of ​​the Kirkiya operation area was used to demolish the new brick fences. Construction period: 150 days (b), second bid section: technical protection section 1, video surveillance system in the Hetian River operation area, barrier system, etc. 2. Dabei operation area security system is divided into video surveillance system, perimeter alarm system, emergency alarm system and barrier system. 3. Video surveillance system, emergency alarm system, perimeter alarm system, barrier system, etc. in the Kekeya operation area. 4, Ake operation area includes video surveillance system, emergency alarm system, barrier system, perimeter alarm system. Construction period: 150 days (including equipment purchase)
III. Bidder qualification requirements
1. Physical protection part: The applicant has the qualified qualifications of Grade 2 and above for the general contracting of the construction of the house, and has the corresponding insurance ability in terms of personnel, equipment and funds. 2. Information systems integrate secondary and above related qualification conditions, and have corresponding insurance capabilities in personnel, equipment, and funds. 3, this tender does not accept the Commonwealth bid. 4. The name of the project in the bid documents of the applicant must be consistent with the above-mentioned names. 5. The occurrence of quality and safety accidents in the Tarim Oilfield Company and Tazhong Southwest Exploration and Development Company is a negative item.
IV. Acquisition of tender documents
Bidding Document Release Date: November 10, 2016 10:00:00

Half In-ear Wireless Headset

Sports can't be abandoned more freely
Close ergonomic design, close to the ear, even wearing for a long time can also enjoy comfortable experience.

And can form a triangular stable support with the ear, even if running and riding, vigorous fitness is still close to the ears, wildly shake off.


Description of connection OK
music doesn't wait
After the first successful pairing, the boot automatically back up, no unnecessary operation
When the earphone is turned on, it can be automatically reconnected.

Note: the first pairing should be done manually in the bluetooth Settings of the device only Ensure that the bluetooth function of the device is turned on normally

Noise Cancelling Earbuds,Bluetooth Earphone Price,Half In-Ear Wireless Headset,Wireless Bluetooth Earphones

Guangzhou HangDeng Tech Co. Ltd , https://www.hangdengtech.com

This entry was posted in on