Sewage treatment plant high pole lamp bidding procurement announcement


Tender No.: No tendering agent has been prepared: No other entrusted owner: Shandong Zouping County Municipal Wastewater Treatment Plant Registration Deadline: 2009-11-20
Region: Shandong Industry: Electrical and Electronic Appliances

Due to the construction needs of the Zouping County Urban Sewage Treatment Plant in Shandong Province, a number of high-bar lights need to be purchased. Bidders who meet the bidding documents are invited to bid.
I. Tenderer: Urban Wastewater Treatment Plant of Zouping County, Shandong Province Contact: Zhang Weifang, Wei Guoxing (13455799899)
Telephone fax 2. Documents and documents to be provided by the bidding enterprise to purchase the bidding documents:
1. Business license of the bidding enterprise (original or photocopy of official seal)
2, the production and manufacturing license of the equipment (original or a copy of the official seal)
3. Bidder's legal representative authorization
4. 2 samples of product samples 3. Time for obtaining bidding documents: From now on, 8:30 to 17:00 (Beijing time) every day;
Address: Zouping County, Shandong Province, urban sewage treatment plant bidding documents Price: 200 yuan / share four, submitting tenders deadline: November 20, 2009 9:00 (Beijing time)
Address: Urban Wastewater Treatment Plant, Zouping County, Shandong Province V. Bid Opening Time: 9:00, November 20, 2009 (Beijing time)
Bid Opening Address: Urban Wastewater Treatment Plant, Zouping County, Shandong Province 6. Bid security: RMB 5,000.
Zouping County Urban Sewage Treatment Plant, Shandong Province

Due to the construction needs of the factory, Zouping County Wastewater Treatment Plant wants to order a batch of 25-meter high pole lamps. It is now open to the qualified social suppliers for inquiry and bidding. All bidding suppliers are welcome to bid.
First, the product name, quantity, specifications:
The number of parameters requires remarks: high pole lamp 3 sets of pole height? 25 meters, ground irradiation range of 90 degrees, illumination radius R? 120 meters, wall thickness? 6mm; ground illumination is not less than 30lx, the total power of each set of high pole lights is not More than 4kW. The height of the pole refers to the vertical distance from the top of the pole to the ground; the wall thickness of the pole is the net thickness of the steel that does not include galvanized and sprayed layers. The take-off and drop cable for the lamp panel for maintenance is a stainless steel cord.
High pole lamp 2 sets of pole height 25 meters, ground irradiation range of 180 degrees, illumination radius R? 120 meters, wall thickness? 6mm; ground illumination is not less than 30lx, the total power of each set of high pole lights is not more than 6kW. The pole light 1 set is 25 meters high, the ground irradiation range is 360 degrees, the illumination radius is R?120 meters, the wall thickness is 6mm; the ground illumination is not less than 30lx, and the total power of each set of high pole lights is not more than 12kW. 1 set of pole height? 25 meters, ground irradiation range of 120 degrees, illumination radius R? 120 meters, wall thickness? 6mm; ground illumination is not less than 30lx, the total power of each set of high pole lights is not more than 5kW. Ibid. : All bidders have unclear details of the bidding or reasonable proposals for bidding. They must be sent to Zouping Sewage Treatment Plant in written form before November 17, 2009, or faxed to 0543-2101167, Wei Guoxing.
Third, technical requirements:
1. In order to facilitate the evaluation of bids and ensure the quality, the tenderer shall implement the recommended manufacturer or brand for the main materials or equipment of this bid. Bidders use the materials or equipment of these manufacturers or brands for quotation at the time of quotation;
2. The tenderer recommends the manufacturer, brand and specifications of the main materials or equipment for the bidding. The bidder shall choose one brand according to the following brands; however, the selected brand shall be clearly stated in the bidding documents. The recommended cables and light sources are as follows:

Serial number material (equipment) name brand requirement note
1 Cable national inspection-free products are accompanied by a national exemption certificate
2 Well-known pure imported brand of light source (original set of pure imported) Floodlight housing (white), supporting electrical appliances (ballasts, triggers, capacitors, etc.) are the same brand of imported products as the selected light source, supporting electrical appliances The service life is not less than 5 years; the light source is imported high-pressure sodium lamp, the service life is more than 24000 hours; the ballast must be energy-saving. Imported products must provide a copy of the bill of lading stamped with the customs clearance and equipment and raw materials importer inspection certificate and related certification materials
3. The tenderee's technical requirements and main materials or equipment requirements for this tender are as follows:
3.1 Standard requirements for light poles:
(1)Material: The material of the lamp pole is made of Baosteel, WISCO, Sangang, Anshan Iron and other large SS400 low-silicon low-carbon high-strength steel (Si≤0.04%), the thickness is not less than 6mm, and the thickness of the bottom flange is ≥20mm. It is required to ensure the hardness and adhesion of the hot-dip galvanized bottom, and the surface is not black. Meet national or corporate standards, and provide steel supply contracts and steel quality certificates. The spotlight mounting bracket is a split channel, the lamp slot is not less than 40 mm*80 mm, the middle bracket of the lamp is not less than 40mm*60 mm, and the thickness of the two is 3.5 mm.
(2) Design: The structure of the light pole and the size of the basic structure are calculated according to the shape and shape of the final bidding and the structural parameters of the manufacturer. The main pole is hexagonal and the pole is convenient for transportation. The high pole light pole adopts plug-in type, and each section is formed once. The length of the plugging is not less than 1200mm. After the pole is inserted, the matching clearance should not exceed 3mm, and there are reliable limit devices and solid devices. The basic design of the pole should be matched with the pole. The foundation is made of concrete. The foundation bolts for fixing the pole flange and the lower flange for fixing the anchor bolts are left on the foundation; the threading of the cable embedded in and out of the foundation The pipe and the threading pipe are made of hot-dip galvanized steel pipe, and the construction drawings of the basic reinforcement and concrete strength grade are marked. The foundation conforms to the seismic design specification of GBJ11-89; all the fasteners except the basic bolt are made of stainless steel. Reliable, durable and easy to operate. For all kinds of nuts, the gasket and spring washer should be added. After tightening, the screw exposed nut should not be less than two pitches. An independent lightning rod is arranged at the top to meet the lightning protection requirements. A grounding body is arranged around the lamp base. The grounding resistance is not more than 30 ohms. The grounding pole is 2.5 meters long, 50*5 galvanized angle steel, and the ground connection cable is 25*4 galvanized flat. steel. The grounding body should be reliably connected with the lamp pole, the lamp panel, the distribution box, etc. to form a reliable conductive path. The manufacturer provides the bar diagram and force calculation book according to the lamp pole shape drawing, including the calculation book of pre-embedded screw and flange, and provides the technical drawings and basic large sample diagram of the lamp post (basic section drawing, position of the embedded cable tube in the foundation) Diagram, connection diagram of bolts and high pole lights, position map of basic embedded parts, etc.).
(3) Welding process: argon gas protection welding should be adopted. The entire rod body should be free of any leak welding, and the weld bead is smooth without any welding defects. The weld seam meets the GB/T3323-1987 Class III standard, and the penetration depth is over 805. It is required to provide a welding flaw detection report.
(4) Hot-dip galvanizing process: The inner and outer surfaces of the lamp post, the lamp panel and all metal fitting surfaces shall be hot-dip galvanized. The galvanized layer is required to be uniform and the thickness is not less than 65 mm; the galvanized surface should be smooth and beautiful. It meets the GB/T13912-92 standard and provides a galvanized test report.
(5) Spraying process: It should be passivated after galvanizing, and the spray adhesion is good, the thickness is ≥80 ???m (the color is white). Spray plastic should use imported high quality plastic powder. Meets ASTM D3359-83 standard and provides spray test report.
(6) The perception of the rod body: the shape and size meet the requirements, the shape is smooth and harmonious, the appearance is elegant, the color is uniform, and the taper ratio is reasonable. The surface of the rod is smooth and uniform with no transverse welds. Blade scratch test (25 ??? 25mm square) spray layer strong adhesion is not easy to peel off, galvanized layer is smooth and even. The lamp post is sealed and the top of the bag is filled with waterproof gas, and the waterproof and internal leakage measures are reliable. The poles are flange mounted and mounted to the foundation by anchor bolts. The bottom of the pole has a base flange, which is mounted on the foundation by anchor bolts. The thickness of the flange is not less than 20mm, which is determined by the contractor according to the site conditions and the form of the pole. A special junction box and grounding bolts shall be provided in the lower maintenance gate of the pole. The junction box is mounted on the lamp post bracket. The relative size of the screw holes of the bracket should be determined according to the actual size of the control board. The installation position should be convenient for maintenance.
(7) Verticality test: After the pole is upright, the two-way perpendicularity of the rod is tested using the theodolite, and the deviation of the perpendicularity should be ≤0.2%. The pole design has a service life of 30 years.
(8) Electrical door: 1 door uses plasma cutting. There should be a high degree of interchangeability. 2 The electrical door should be integrated with the shaft and have good structural strength. 3 With reasonable operating space, the door has electrical installation accessories, electrical installation boards must be provided, and copper grounding bolts are provided. The gap between the 4 door and the rod should not exceed one millimeter, and it has good waterproof performance. 5 has a special fastening system, all fasteners are made of stainless steel, reliable and durable. The embedded safety inspection door is used to set the locking device (anti-smashing and anti-theft), which has good anti-theft performance. 6 position size, junction box beam, grounding point, etc. can also be required by the management unit. There is an electrical equipment room inside the light pole, and a power distribution box is installed indoors; the power distribution box can realize local control and remote control (remote control lead terminal) device, and the spot light can adopt single control, joint control and other control modes; The connecting wires and the main cable from the power distribution room to the lamp post are provided by the winning bidder (the voltage level and voltage drop requirements must be met).
(9) The winning bidder shall be responsible for the production, installation and commissioning of the concrete foundation of all the light poles until the lighting is completed. The lighting range is detailed in the above table.
3.2 Lighting parts:
(1) Novel design, beautiful appearance; reasonable light distribution, high luminous efficiency, low glare optical system; low wind resistance, high protection level; good anti-corrosion and sun-proof performance, uniform paint without foaming. The luminaire requires the back cover to be opened, and can be easily opened, installed and maintained, and easy to use; the projection angle of the luminaire can be adjusted according to the scale; the peak current and the normal current are low, and the half-year light fading should not exceed 5%. The lampshade is not easy to break, has high light transmittance and high temperature resistance. The connection between the luminaire and the mounting coupling is robust and reliable. All electric light source devices of the luminaire can be assembled, unloaded, maintained and replaced conveniently. All wirings have no bare wire head country; service life ≥ 20,000 hours.
(2) Material characteristics: The lamp body is made of high-quality high-pressure cast aluminum, the top cover is made of high-quality aluminum material, and it has excellent mechanical strength. All connections and fasteners are made of stainless steel; high temperature resistance, high light transmittance and high difficulty. Broken transparent lampshade; galvanized steel bracket, high-precision anodized aluminum reflector; internal parts should be fire retardant. The lamp housing is die-casted from aluminum alloy, and the lamp body and coupling parts are made of special high-strength aluminum alloy die-casting; high transmittance tempered glass. It should conform to the current national product standards, have the certificate of conformity and product performance specifications approved by the quality inspection department, and should indicate the manufacturer, specifications and production date.
(3) Technical parameters: protection above IP66, electrical performance of class II, insulation resistance of lamps ≥2M???, power factor >0.85.
(4) Optical system: Extrusion molded sealing ring with imported high temperature resistant silicone rubber, tempered glass (temperature resistant 200 ° C) high purity aluminum high-efficiency reflector (reflector surface anodized, surface oxidation degree SiO2 glass film High reflectivity, ensuring high output of light flux), organically sealed into an advanced optical system; requires reasonable light distribution and high light output.
(5) All exposed fasteners and fasteners of the lamps are made of stainless steel. The bolts, screws and nuts meet the GB3099-82 standard. All solid insulation materials meet the GB4207-84 standard.
(6) Porcelain lamp holder is anti-loose stainless steel inner ring porcelain lamp holder. The technical condition of porcelain lamp holder is in line with national or industry standards. The lamp and dimmer are made of flame retardant engineering plastic.
(7) All the wires in the lamp are flame retardant and high temperature resistant silicone rubber wire, and self-extinguishing casing is flame retardant. The specification is 2?4mm2, and the wire meets the GB5013 standard.
(8) All built-in steel parts in the lamp are treated with anti-corrosion treatment, and the main parts are also sprayed with pure polyester resin. Ensure that the perishable parts will not corrode after long-term use of the lamps.
(9) Technical indicators

Project technical index shell opening mode front door opening protection grade IP65
The whole casing of high-voltage aluminum alloy plate (including copper <0.4%) with a thickness of not less than 2mm is made of aluminum plate with a reflector thickness of not less than 0.8mm. The structure is firm and can withstand cleaning. The non-deformable glass mask is not less than 5mm thick non-astigmatism temperature resistant tempered glass
(10) The registered capital of the manufacturer of the luminaire manufacturer must be 2 million yuan or more.
3.3 Light source:
(1) The energy-saving high-pressure sodium lamp is used, and the increased output power is used with a trigger to restore the startup bulb to re-light within 60 seconds after a short pause.
(2) Capacitors should be installed to achieve a power factor of 0.9. The ballast should be a low loss model.
(3) Technical indicators of technical indicators of lamps
400W high pressure sodium lamp? 48000lm
600W high pressure sodium lamp? 72000lm
800W high pressure sodium lamp? 96000lm
100W high pressure sodium lamp? 1`30000lm
Light source life 24000h
Adaptation voltage 220v???10%
3.4 cable:
(1) The cable shall be manufactured by an approved manufacturer with a complete seal and warranty from the manufacturer. The integrity of the seal should be maintained for inspection and documentation in the event of a failure in the future, and all cables must be certified for product testing.
(2) The cable should be installed on the cable tray and the cable end should be effectively sealed. When the cable on the cable reel is cut, the remaining ends are sealed immediately to prevent moisture ingress.
(3) The cable should be adapted to the surrounding environmental conditions and installation conditions.
(4) In the process of cable distribution, the principle of economy and reasonable use should be adopted to match the main and backup cables used in the system.
(5) The laying cable is directly buried. The detailed method of cable routing is submitted to the supervision engineer for approval. The cable should be supported in all access holes. The position of the tube hole and the cable tray occupied by each cable through each access hole should be consistent and then avoid the cables crossing each other or from one side of the entrance hole to the other side.
4. If it is found that the design drawings are wrong or some changes are required to the original design drawings according to the construction site conditions, it must be confirmed by the tenderee, but the cost remains unchanged.
5. Light type please provide samples and pictures for bidders to stun
6. Engineering quality requirements and acceptance
6.1 Quality Acceptance Requirements: The winning bidder must strictly follow the design and construction drawings and relevant construction and acceptance specifications to ensure that the quality of the project has passed the acceptance of the relevant departments to meet the quality requirements of the project.
6.2 Construction materials
(1) Materials, components, equipment and construction site safety protection products used in construction engineering must meet design requirements and product quality standards. The winning bidder may not shoddy it, fake it, and cut corners.
(2) Products related to professional requirements such as fire protection and environmental protection shall be approved by the local fire protection and environmental protection departments.
6.3 Unfinished engineering quality technical requirements are implemented in accordance with the relevant national and prosperous city standards and standards.
4. Bidding documents The bidding documents shall include the following parts:
4.1 Letter on the bidding for the procurement of high pole lighting equipment for Zouping County Wastewater Treatment Plant
4.2 Company Profile
4.3 Bids
4.4 Bid Opening List
4.5 Legal representative power of attorney
4.5 Summary of cargo description
4.6 Specification Deviation Table
4.7 Declaration of Qualification
4.8 Project Performance Table (especially in Shandong)
4.9 Professional technical strength and equipment conditions meet technical requirements
4.10 high pole street light technical description
4.11 Introduction to product production process
4.12 Acceptance criteria
4.13 product design drawings (lamp panel (including lamps), lamp poles, foundation and other installation drawings, high pole lamp electrical wiring diagram, operation control schematic diagram, renderings, etc.)
4.14 Commitment to quality assurance and after-sales service (three guarantees period and service response time, etc.)
4.15 Copy of business license
4.16 Copy of tax registration certificate
4.17 Copy of the organization code certificate
4.18 Copy of enterprise credit rating (including licenses that meet the requirements of the national power department)
4.19 Copy of the international quality management system certification certificate
4.20 sample: Install the lamps (and accessories such as ballasts, triggers, capacitors, etc.), the lamp panel of the light source and the physical sample of the pole (including the flange) about 1 meter high (each piece)
4.21 Information that other bidders consider necessary to provide.
The bidder shall quote all the purchased goods and fill in the unit price of the bidding goods and the total bid price according to various raw materials and components. If the unit price and the total price are inconsistent, the relatively low unit price shall prevail. The bidding quotation of the bidding unit has included the labor, materials, transportation, loading and unloading, machinery, quality inspection, warranty, management, insurance, profit, tax, policy price adjustment, market change and contract express required for the implementation and completion of the bidding content. All responsibilities, obligations and risks are required to arrive at the delivery and on-site installation. Renminbi is used in the bidding quotation. The bidder shall fully understand all the contents of the bidding documents. Once submitted, the bidding documents shall indicate that the bidders have fully understood and fully confirm the entire contents of the bidding documents. The bid documents confirmed by the bidder have the legal effect.
V. Invalid bidding
(1) Timed delivery;
(2) The bid documents are not sealed;
(3) The bid documents are not stamped with the seal of the unit as required;
(4) The tender documents lack documents to be provided;
(5) Specifications, models, technical parameters and categories are not specified in the bid documents.
(6) At the time of bid opening, the authorized representative who participated in the bidding failed to clarify the suspected bidding. In this case, the bid evaluation team will regard it as the bidder's automatic waiver;
(7) We have supplied materials and equipment for our factory, but there are bids for unqualified credit-worthy enterprises after the first acceptance of the products.
(8) Other bids that do not meet the requirements of the bidding documents.
6. Bid time: 9:00 am (Beijing time) on November 20, 2009
7. The tender accepting department:
All bidders are required to seal the tender documents with the document bag within the prescribed bidding time, and after putting the official seal on the seal, the bidding credit guarantee and the registration fee receipt issued by the Finance Department of our factory will be sent to our factory. . The target sample was sent to the office building of our factory. My unit refuses any late bid documents.
8. Bid Opening Time: 9:00 am (Beijing time) on November 20, 2009
Nine, delivery time: Installation completed within 15 days after the contract is signed. 10. Payment method:
The winning bidder did not make advance payment after signing the contract with our factory. During the contract period, the goods will be installed in our factory. After the acceptance is passed, 90% of the contract will be paid; the remaining 10% of the contract will be used as the quality guarantee. No quality problems and other defaults will be paid after one year from the date of installation and acceptance. .
XI. Principles of Bid Evaluation The evaluation team of our factory will comprehensively evaluate the quality, quotation, service, delivery date, creditworthiness of bidders and other factors in the bidding standard in accordance with the principles of fairness, impartiality and openness.
1. The bidding documents must basically meet the requirements of the bidding documents.
2. The quotation is reasonable.
3. The bidder has the ability to perform.
4, can provide the best service to ensure quality.
5. If the bidding price of the bidder exceeds the price announced by the media at the time, the bid evaluation team has the right to dispose of the bid.
6. The factory reserves the right to open the bid.
Twelve, instructions
(1) The bid documents will not be returned, and the bidders are required to keep the drafts;
(2) The bidder submits the bid to the Zouping Sewage Treatment Plant, which means that it responds to the provisions in the bidding documents of our factory. Pay 200 yuan for the registration fee (the fee will not be refunded), and also pay 5,000 yuan for the tender credit guarantee. After the bid opening, if the bid is not won, the deposit refund procedure can be processed immediately; the winning bid will be returned after the acceptance is passed. The other unsuccessful samples will be retrieved within 10 working days after the opening of the bid, otherwise it will be deemed as a waiver by the manufacturer and will not be given to us.
(3) After receiving the notice of winning the bid, the winning bidder must come to our factory to sign the contract within three working days. If the winning bidder refuses to sign the contract according to the specified time, our factory regards it as the winning bidder to waive the bidding right. The bid security deposit paid by the winning bidder is not refundable. Our factory has the right to decide the second winning bidder or reorganize the bidding.
(4) All costs incurred by the bidder for the bidding shall be borne by the bidder, including the preparation of the bidding documents and the delivery of the bidding documents.

Ni-Cd Battery Packs

Ni-Cd Battery Packs,Power Bank ,Portable Charger ,Portable Phone Charger

Storage Battery Co., Ltd. , http://www.battery-spark-e.com

This entry was posted in on