General Affairs Department Cultural Relics Exhibition promotes design integration and supervision tender

General Affairs Department Cultural Relics Exhibition promotes design integration and supervision tender

Tender No.: Calling Public Capital [2016] - Engineering - Public - 08933
First, the tender conditions
The General Logistics Department's cultural relics exhibition has promoted the integration of design and construction and the supervision has been registered with the Hohhot Construction Project Bidding Management Office. The tenderer is the General Bureau of Inner Mongolia Autonomous Region General Administration of Science and Technology, and the state-owned investment for the necessary funding sources for the project is 100, self-raised 0, and the government invests 100. Non-state investment 0, the project plans to invest 21 million yuan. The project has already met the conditions for bidding and the project is now undergoing an open tender.
II. Project Overview and the scope of tender
(1) Project Name: General Affairs Department Cultural Relics Exhibition Promotion of Design and Construction Integration and Supervision
(II) Construction site: 31 Xinhua Street, Hohhot
(III) Bidding content: The General Archives Museum covers an area of ​​26,400 square meters, with the Museum of the Republic of Inner Mongolia Autonomous Region as the main body, and the “9/19” Kuangyuan Uprising Memorial Museum of the Republic of China as an auxiliary thematic museum. This exhibition has been promoted. The main style is the architectural style of the Qing Dynasty, including the basic display of the General Armed Forces Department and the display of the “Nine to Nine-Year” Memorial Hall.
Lot No. Tender Name Enterprise Qualification Requirements Qualification Requirements Duration Contract Estimate (10,000 yuan)
Calling Public Capital [2016] - Engineering - Public - 08.93-01 General Services Department Cultural Relics Exhibition Promotion of Design and Construction Integration ([Construction and Decoration Engineering Professional Contracting Level 1] and ([Engineering Design Integration Level A] or [Construction Decoration Engineering Design Grade A])) or [Building Decoration Engineering Design and Construction Integration Level] 142 Calendar Day 2040.00
The General Armed Forces Museum’s museum covers an area of ​​26,400 square meters. The main museum is the General Bureau of the Inner Mongolia Autonomous Region, and the “9/19” Qiang Uprising Memorial Museum of the Republic of China is an auxiliary thematic museum. This exhibition promotes the architectural style of the Qing Dynasty as The keynotes include the basic display of the General Services Department and the design and construction of the "Nine to Nine" Memorial.
Calling the Public Capital [2016]-Project-Publishing-0893-02 Generative Affairs Department Cultural Relics Exhibition Promotion Design and Construction Integration Supervision [Classification of Cultural Relics Protection Project Supervision] 142 calendar days 60.00
The General Services Department’s cultural relics exhibition promoted the supervision of the entire construction process.
Third, bidder qualification requirements
1. The Commonwealth does not accept bids from the Commonwealth.
2, bid unit registration requirements:
General Relics' Cultural Relic Exhibition promotes design and construction integration
General Affairs Department's Cultural Relics Exhibition promotes integrated design and construction supervision
3, other requirements:
(1) The person responsible for the design and construction integration project must have the Associate Professor of Cultural Relics Museum and the above professional technical title.
(2) The person in charge of the supervision project must have the Associate Professor of Cultural Relics Museum and the above professional technical titles.
(2) Application time: From December 15, 2016 to December 17, 2016 at 17:00 (Beijing time), overdue time will not be accepted.

Strain/flex Reliefs And Grommets

the power Connectors we provide overmolding solutions and modular tooling.

We also offer to the OEM and distributor users a diversified line of strain / flex reliefs and grommets, such as Solid, Solid-Rib, Uniflex, Multiflex, in standard off the shelf or custom designs.

Overmolding the power connectors offers significant opportunities for cable improvements with higher pull strength not available with conventional backshells. Our technical staff is ready to help you from design and prototyping to small production run, assistance, and training.

Our team is ready to help with any of the following power connectors projects: overmolding mini fit jr. and mini-fit sr. connectors, , overmolded cables with micro fit terminations, sabre molded cable asemblies, amp duac overmolded power connectors, mate-n-lock power cables, power connector overmolding services, power connector molding, design and prototype of power cables across the board, small run molded power connecotrs , molded cable manufacturing, overmolding connectors for any power applications



Strain Reliefs And Grommets,Flex Reliefs And Grommets,Cable Strain Reliefs,Cable Flex Reliefs,Cable Grommets,Molded Strain Relief

ETOP WIREHARNESS LIMITED , http://www.wireharness-assembling.com

This entry was posted in on